Maturity model

Five advisory maturity levels

The levels describe how reliably controls are governed, implemented, evidenced and improved - from Foundational to Leading. They are advisory descriptors, not stars, certificates or approvals.

Foundational Developing Defined Advanced Leading

Not a star rating or approval

Maturity levels are advisory descriptors, not stars, certificates, compliance ratings or regulatory approvals. They describe management reliability and evidence - nothing more.

LEVEL 1

Foundational

Absent or reactive

LEVEL 2

Developing

Inconsistent

LEVEL 3

Defined

Repeatable

LEVEL 4

Advanced

Monitored

LEVEL 5

Leading

Anticipatory

Level descriptors

What each level looks like

Each level sets out the pattern of governance, implementation, evidence and improvement you would expect to see.

1

Foundational Absent or reactive

Controls are absent, reactive, informal or materially incomplete. Evidence is largely anecdotal and improvement is unplanned.

  • Critical controls undefined or unassigned
  • Reliance on individuals rather than systems
  • Little or no reliable evidence of operation
2

Developing Inconsistent

Controls exist in parts but implementation and evidence are inconsistent across areas, shifts or contractors.

  • Controls documented but unevenly applied
  • Evidence available in some areas only
  • Improvement reactive rather than planned
3

Defined Repeatable

Controls are documented, assigned and generally implemented with repeatable evidence across the operation.

  • Controls consistently defined and owned
  • Repeatable evidence of implementation
  • Actions tracked to closure
4

Advanced Monitored

Controls are consistently implemented, monitored and improved using performance evidence and verification.

  • Field verification of control effectiveness
  • Performance data drives management action
  • Systematic corrective-action learning
5

Leading Anticipatory

Controls are integrated, anticipatory and continuously improved, supported by strong, challengeable evidence.

  • Integrated, anticipatory risk management
  • Strong, reproducible and challengeable evidence
  • Continuous, measured improvement

Protection against false comfort

The level is not just an average

Arithmetic is diagnostic. Two independent mechanisms can change the reported level.

Confidence and coverage can cap or withhold a conclusion where the assessment basis is weak - for example, when applicable evidence is missing or sampling is limited.

Critical-control gates can override a high average entirely. A material critical-control failure caps the level at Foundational or Developing, or causes it to be withheld. Gate assignment and release require competent moderation and evidence.

See how the gates work

Independent advisory work only. Conclusions are limited to the agreed scope, evidence and sampling, and may require specialist and jurisdiction-specific review. This is not an official rating, certification, legal-compliance opinion or guarantee of future performance.